Greater Beirut Water Supply Project, Zone D – Phase I Project
Details : The works cover an area situated to the east of Beirut City, extending from Jisr El Basha in the south to Jdeideh. The main villages included in the project are: Sin El Fill, Mkalles, Dekwaneh, Mar Roukoz, Fanar, Jdeideh and Baouchrieh.
-
54 Km of transmission, Pumping and Distribution lines (for Ductile Iron, diameter ranging between 150 mm and 600 mm; for Polyethylene Pipes between 50 mm and 180 mm)
-
6 Reinforced concrete water storage tanks: 1* 1000 m*, 1* 1500 m* and 4* 2000 m3. (Total of 6500 m3 of reinforced concrete works)
-
Construction of 3 pumping stations for the water supply of the network
Date & Duration : from 2015 to 2018
Client : Establishment of The Water of Beirut & Mount Lebanon
Main Contractor : Lindenberg Emirates L.L.C.
Consultant : Dar Al Handasah Nazih Taleb & Partners